Economic Production Quantity as an instrument for Management Decision

Authors

  • Altair Almeida Dias Universidade Presbiteriana Mackenzie
  • Flavio Roberto Mantovani Universidade Presbiteriana Mackenzie

Keywords:

Economic Production Quantity, Managerial Decision, Production Management

Abstract

This work aims to present and discuss the results of a proposal to implement the economic lot-sizing (ELS) calculation tool as an instrument for management decision making in industrial organizations regarding the optimization of the production process and management of demands and inventories, as well as the minimization of production total cost. The base theory used in this study was old institutional economics (OIE) using Burns and Scapens’ (2000) model. The research method adopted is characterized by the applied ature, through interventionist research and data analysis with a qualitative approach. Data collection was done through a bibliographical and documentary survey, as well as a case study from the action research that aims to propose the implementation of a new model of production system through the adoption of the integrated ELS calculation tool to the department of planning, programming and production control of the company object of the study. The use of the ELS for the company’s most important product would result in a 9,98% reduction in the total production costs.

Downloads

Download data is not yet available.

Author Biography

Flavio Roberto Mantovani, Universidade Presbiteriana Mackenzie

CCSA - Contábeis

References

Aldurgam, M. M., Selim, S. Z., Al-Shihabi, S. T., & Al-Durgham, L. (2019). Economic production quantity model with variable machining rates and product quality. International Journal of Engineering Business Management, 11. doi:1847979019872619

Arnold, J. R. T. (1999). Administração de materiais. São Paulo: Atlas.

Ballou, R. H. (2007). Logística empresarial. São Paulo: Atlas.

Banzato, E., Carrilo, E., Jr., Banzato, J. M., Moura, R. A., & Rago, S. F. T. (2003). Atualidades na armazenagem. São Paulo: Imam.

Bardin, L. (1997). Análise de conteúdo. Lisboa: Edições 70.

Bowersox, D. J., & Closs, D. J. (2001). Logística empresarial: O processo de integração da cadeia de suprimento. São Paulo: Atlas.

Burns, J., & Scapens, R. W. (2000). Conceptualizing management accounting change: An institutional framework. Management Accounting Research, 11(1), 3-25.

Carvalho, C. R. V., & Santos, A. M. (2006). Dimensionamento de lote de produção em um problema de sequenciamento de uma máquina com tempo de preparação: Aplicação a uma indústria química. Anais do 38º Simpósio Brasileiro de Pesquisa Operacional, 1922-1933.

Carvalho, J. M. C. de (2009). Logística (3a. ed.). Lisboa: Edições Silabo.

Cervo, A., & Bervian, P. A. (1996). Metodologia científica (4a. ed.). São Paulo: Makron Books.

Corrêa, H. L., & Dias, G. P. P. (1998). De volta a gestão de estoques: As técnicas estão sendo usadas pelas empresas? Recuperado de http://www.proage.com.br/proage/exe/empresa/publicacoes/de_volta_a_gestao_de_estoques.pdf.

Corrêa, H. L., Gianesi, I. G. N., & Caon, M. (2007). Planejamento, programação e controle da produção (4a. ed.). São Paulo: Atlas.

Creswell, J. W. (2010). Projeto de pesquisa: Métodos qualitativo, quantitativo e misto (3a. ed.). Porto Alegre: Artmed.

Dias, M. A. P. (2006). Administração de materiais: Princípios, conceitos e gestão (5a. ed.). São Paulo: Atlas.

Fernandes, F. C. F., & Godinho, F. M. (2010). Planejamento e controle da produção: Dos fundamentos ao essencial. São Paulo: Atlas.

Fleury, P. F., Wanke, P., & Figueiredo, K. F. (2000). Logística empresarial: A perspectiva brasileira. São Paulo: Atlas.

Gil, A. C. (2002). Como elaborar projetos de pesquisa (4a. ed.) São Paulo: Atlas.

Godinho, M., Filho, & Uzsoy, R. (2010). Estudo do efeito de programas de melhoria contínua em variáveis do chão de fábrica na relação entre tamanho de lote de produção e lead time: Lead time relationship. Gestão & Produção, 17(1), 137-148. doi:10.1590/S0104-530X2010000100011

Guarnieri, P., Chrusciack, D., Oliveira, I. L., Hatakeyama, K., & Scandelari, L. (2006). WMS – Warehouse Management System: Adaptação proposta para o gerenciamento da logística reversa. Revista Produção, 16(1), 126-139.

Guerreiro, R. (2006). A abordagem institucional na contabilidade gerencial. Revista Contabilidade & Finanças – USP, (40), 3-6.

Harrington, H. J. (1993). Aperfeiçoando processos empresariais. São Paulo: Makron Books.

Hassan, E. A., Rankin, M., & Lu W. (2014). The development of accounting regulation in Iraq and the IFRS adoption decision: An institutional perspective. The International Journal of Accounting, 49(3), 371-390.

Labro, E., & Tuomela, T. (2003). On bringing more action into management accounting research: Process considerations based on two constructive case studies. European Accounting Review, 12(3), 409-442.

Lukka, K. (2007). Management accounting change and stability: Loosely coupled rules and routines in action. Management Accounting Research, 18(1), 76-101.

Lustosa, L., Mesquita, M. A., Quelhas, O., & Oliveira, R. J. (2008). Planejamento e controle da produção. Rio de Janeiro: Elsevier.

Macagnan, C. B. (2013). Teoría institucional: Escrito teórico sobre los protagonistas de la escuela institucionalista de economía. Base – Revista de Administração e Contabilidade da Unisinos, 10(2), 130-141.

Marcondes, R. C., Miguel, L. A. P., Franklin, M. A., & Perez, G. (2017). Metodologia para trabalhos práticos e aplicados: Administração e contabilidade. São Paulo: Editora Mackenzie.

Martelli, L. L., & Dandaro, F. (2015). Planejamento e controle de estoque nas organmizações. Revista Gestão Industrial, v. 11, n. 2, 170-185.

Martins, P. G., Campos Alt, P. R. (2009). Administração de materiais e recursos patrimoniais. São Paulo: Saraiva.

Moreira, D. A. (2009). Administração da produção e operações. São Paulo: Thomsom Learning.

Nara, E., & Moraes, J. (2017). Programação e controle da produção para casos especiais: Fluxo de informação. Espacios, 38(24), 20.

Nenad, A. G. M. D. (2017). O impacto da satisfação comercial nas reações do consumidor às situações de falta de estoque. Review of Business Management, v. 19, n. 66, 520-537.

North, D. (1995). Instituciones, cambio institucional y desempeño edonómico. México: Foundo de Cultura Económica.

Oliveira, F. R. de (2009). Logística e administração de materiais: Vantagem competitiva (Trabalho de Conclusão de Curso de MBA Executivo em Logística, Faculdade Uirapuru Grupo IBMEC Educacional S/A, São Paulo, Brasil).

Oliveira, R. A. M. de. (2014). A importância do planejamento e controle da produção (PCP) dentro de uma organização (Trabalho de conclusão de curso, Faculdade Cenecista de Capivari, Capivari, Brasil).

Palomino, R. C, & Carli, F. S. (2008). Proposta de modelo de controle de estoques em uma empresa de pequeno porte. Anais do Encontro Nacional de Engenharia de Produção. Rio de Janeiro: Abepro.

Peinado, J. & Graelm, A. R. (2007). Administração da produção: Operações industriais e de serviços. Curitiba: Unicenp.

Peng, H., & Houtum, G. J. van (2016). Joint optimization of condition-based maintenance and production lot-sizing. European Journal of Operational Research, 253(1), 94-107.

Polit, D. F., & Hungler, B. P. (1995). Fundamentos de pesquisa em enfermagem (3a. ed.). Porto Alegre: Artes Médicas.

Scapens, R. W. (2006). Understanding management accounting practices: A personal journey. The British Accounting Review, 38(1), 1-30.

Schoeps, W. (1962). Lote econômico de produção: Conceito e prática. Revista de Administração de Empresas, 2(4), 62-75.

Silva, R. J. da., & Henzel, M. E. (2012). Gestão de estoques: Fator decisivo para a lucratividade organizacional. IberoAmerican Jornal of Industrial Engineering, v. 4, n.7, 100-117.

Silveira da Rosa, S. E, Cosenza, J. P., & Barroso, D. V. (2007). Considerações sobre a indústria do vidro no Brasil. Brasília: Ministério do Desenvolvimento, Indústria e Comércio Exterior; BNDES.

Slack, N., Chambers, S., Johnston, R. (2009). Administração da produção (3a. ed.). São Paulo: Atlas.

Souza, F. B. de, & Pires, S. R. I. (2014). Produzindo para disponibilidade: Uma aplicação da Teoria das Restrições em ambientes de produção para estoque. Gestão & Produção, 21(1), 65-76. doi:10.1590/S0104-530X2013005000007

Suomala, P., & Yrjanainen, J. L. (2012). Management research in practice. New York: Routledge.

Tompkins, J. A. et al. (1996) Facilities planning (2a. ed.). Nova Iorque: John Wiley & Sons.

Triviños, A. N. (1987). Introdução à pesquisa em ciências sociais: A pesquisa qualitativa em educação. São Paulo: Atlas.

Veiga, M. (2014). Armazenagem x estocagem: Qual é a diferença? Vida Logística. Recuperado de http://vidalogistica.com.br/armazenagem-e-estoque/armazenagem-x-estocagem-qual-e-diferenca.

Viana, J. J. (2006). Administração de materiais: Um enfoque prático. São Paulo: Atlas.

Weber, A. H., & Pozza, A. P. D. (2011). Proposta de melhoria no setor de estoque da empresa Armarinhos Tiradentes (Relatório de Estágio, Universidade do Vale do Itajaí, Itajaí, Itajaí, Brasil). Recuperado de http://siaibib01.univali.br/pdf/Aline%20Heloisa%20Weber,%20Anna%20Paula%20Dias%20Pozza.pdf.

Published

2021-10-15

How to Cite

Almeida Dias, A., & Mantovani, F. R. (2021). Economic Production Quantity as an instrument for Management Decision. Práticas Em Contabilidade E Gestão, 9(3). Retrieved from http://editorarevistas.mackenzie.br/index.php/pcg/article/view/14615